icon Government Support For Rooftop Solar

Leverage Available Subsidies
for a Smarter Solar Investment

Turn subsidy eligibility into a stronger solar investment through precise capacity planning and approval-ready execution. With up to ₹78,000 in subsidy support available to eligible households, every stage, from application to commissioning, remains aligned with scheme requirements, household demand, and long-term system performance.

icon Access Your Subsidy

Subsidy Support Backed by Solar Expertise

Inter Solar helps homeowners plan rooftop solar with the right technical foundation from the beginning. Our team assesses the site, recommends suitable system capacity, supports documentation, completes compliant installation, and coordinates commissioning.

For homeowners eligible under the PM Surya Ghar Muft Bijli Yojana, this end-to-end support creates a clearer path to available subsidy benefits while securing reliable generation, lower electricity costs, and long-term system value.

Subsidy Value

Compare Subsidy Support Across System Capacities

1 kW
2 kW
3 kW
Above 3 kW

CONSUMPTION REFERENCE

0–150 monthly units 1–2 kW
150–300 monthly units 2-3 kW
Above 300 monthly units Above 3 kW
1 KW System

₹30,000

A practical starting point for smaller households seeking lower bills through a compact rooftop solar installation.

Note : System capacity should be selected according to electricity consumption, sanctioned load, rooftop area and future requirements.

2 KW System

₹60,000

Ideal for larger households seeking stronger bill savings and the maximum available Central subsidy benefit.

Note : System capacity should be selected according to electricity consumption, sanctioned load, rooftop area and future requirements.

3 KW System

₹78,000

Ideal for larger households seeking stronger bill savings and the maximum available Central subsidy benefit.

Note : System capacity should be selected according to electricity consumption, sanctioned load, rooftop area and future requirements.

3 KW System

₹78,000

Built for homes with higher electricity demand where added generation matters more than additional subsidy value.

Note : System capacity should be selected according to electricity consumption, sanctioned load, rooftop area and future requirements.

icon Scheme Value

Benefits Beyond the Subsidy

Inter Solar connects financial support with technical planning that strengthens long-term system returns.
₹78K CFA Value
₹78K CFA Value

<p>Eligible households can receive up to ₹78,000 towards approved residential rooftop solar capacity.</p>

300+ Units/Mo
300+ Units/Mo

<p>A well-planned 3 kW rooftop system can generate over 300 units monthly under favourable conditions.</p>

5.75% Finance
5.75% Finance

<p>Eligible households can currently access collateral-free rooftop solar financing at 5.75% annually.</p>

DCR Compliance
DCR Compliance

<p>Scheme-compliant DCR modules help protect subsidy eligibility during inspection and final verification.</p>

Net Metering
Net Metering

<p>Surplus generation can receive credits under applicable state policies and DISCOM regulations.</p>

System Sizing
System Sizing

<p>Demand-led capacity planning improves self-consumption and avoids paying for unnecessary system capacity.</p>

icon Central Financial Assistance

Central Subsidy Assistance Across North India

State/UT 1kW 2kW 3kW or Above CFA Category
Punjab ₹30,000 ₹60,000 Up to ₹78,000 Standard
Haryana ₹30,000 ₹60,000 Up to ₹78,000 Standard
Delhi ₹30,000 ₹60,000 Up to ₹78,000 Standard
Uttar Pradesh ₹30,000 ₹60,000 Up to ₹78,000 Standard
Rajasthan ₹30,000 ₹60,000 Up to ₹78,000 Standard
Chandigarh ₹30,000 ₹60,000 Up to ₹78,000 Standard
Himachal Pradesh ₹33,000 ₹66,000 Up to ₹85,000 Special Category
Uttarakhand ₹33,000 ₹66,000 Up to ₹85,000 Special Category
Jammu and Kashmir ₹33,000 ₹66,000 Up to ₹85,000 Special Category
Ladakh ₹33,000 ₹66,000 Up to ₹85,000 Special Category

Note: Figures show Central Financial Assistance (CFA) for eligible residential rooftop systems. Additional state incentives, where available, are calculated separately.

icon Eligibility

Determine Your Readiness
for Subsidy Support

Review the essential household, rooftop, and electricity connections before beginning your subsidy application.

  • Applicant must be an Indian citizen.
  • Property must have a valid residential electricity connection.
  • Rooftop must provide suitable space for solar installation.
  • Household must not have claimed an earlier rooftop solar subsidy.
  • Application must be registered through the designated national portal.
  • Proposed system must meet applicable scheme and DISCOM requirements.
icon Process Engineering

From Application to Commissioning

Inter Solar coordinates the technical and portal-linked stages of your rooftop project, helping each submission, installation milestone, and verification requirement progress towards commissioning and eligible subsidy disbursal.

01
Load Assessment
The team reviews electricity consumption, sanctioned load, available roof area, shading, structural condition, and installation constraints to determine a practical subsidy-linked system capacity from the outset.
02
Portal Registration
We assist with National Portal registration using the consumer number, mobile details, state, and DISCOM information, ensuring the process begins with accurate household and connection records.
03
Application Filing
Our team prepares the rooftop solar application, aligns proposed capacity with household demand, and supports the technical information required for portal processing and applicable DISCOM review.
04
System Engineering
Following the site survey, we finalise module configuration, inverter sizing, mounting layout, cable routing, protection systems, and project specifications before installation begins and technical documentation is completed.
05
Compliant Installation
Inter Solar executes the finalised design using eligible equipment, compliant safety components, proper earthing, and quality workmanship suited to dependable grid-connected operation and stable long-term generation.
06
Document Submission
After installation, we organise plant details, photographs, invoices, and supporting documents for portal submission, helping reduce gaps before inspection, net-metering coordination, and avoidable processing delays.
07
DISCOM Commissioning
The DISCOM verifies the installation, completes applicable net-metering formalities, and records commissioning. Inter Solar addresses technical observations and supports documentation follow-ups throughout this verification stage.
08
Subsidy Disbursal
Once commissioning is recorded, bank details and the subsidy redemption request are submitted through the portal. Approved CFA is transferred directly to the homeowner's verified account.
icon Contact Us

Start Your Subsidy-Ready Solar Project Today

Share your requirements and let our experts identify the right subsidy route.

General Inquiries
info@intersolarsystems.com
Personal Information
Subsidy Form
Verify You're Human

This helps us keep our platform secure.

What is 7 + 7 ?
icon FAQs

Everything You Need To Know

No. Standard-category households receive ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, creating a maximum Central subsidy of ₹78,000. Larger systems can still be installed for higher electricity demand, but capacity beyond 3 kW does not receive additional CFA.

Yes, where the respective State or Union Territory provides an additional rooftop solar incentive. Such support may supplement the Central Financial Assistance, but eligibility, rates, availability, and processing conditions vary by location. Inter Solar can review your state, DISCOM, and consumer category before estimating the applicable subsidy route.

The subsidy is processed after installation, DISCOM inspection, commissioning, document verification, and submission of the redemption request through the National Portal. Once all credentials and bank details are correct, official data indicates an average processing time of approximately 15 days after redemption. The approved amount is transferred directly to the beneficiary’s account.

Additional CFA may be available only for the remaining eligible capacity within the overall 3 kW subsidy limit. For example, a household that previously received subsidy for 1 kW may qualify for support on up to 2 kW of added capacity. Relocated systems are not treated as new installations for subsidy purposes.

Yes. Group Housing Societies and Resident Welfare Associations can receive CFA for solar systems powering common facilities, including eligible EV-charging infrastructure. Supported capacity is limited to 500 kWp and calculated at up to 3 kWp per household. The common connection must not supply electricity directly to individual residential consumers.

Discuss Your Solar Requirements With Experts Who Deliver Certainty And Performance.

WhatsApp
Connect On
WhatsApp